Location: Meath, Ireland
System Standard: EN 50522
Client: John Paul Construction
Scope of work: Installation and commissioning of the LV Substation and Site-Wide Earthing Network. This system consisted of 120sqm conductor connected using underground crimp connections. All underground connections were exothermically welded.
Duration: 3-month contract