Location: Dublin, Ireland
System Standard: EN 62305 & EN 50522
Client: Winthrop Engineering
Scope of work: Supply, installation and commissioning of the
Structural Lightning Protection System. Supply, installation and commissioning of the Site-Wide Earthing Network. All underground connections were exothermically welded.
Duration: 13 month contract